Outdoor unit VRV A Cold One-Dimensional, Gas R410a – Model RXQ16BYM | Capacity 154,000 Btu/h

Product Introduction RXQ16BYM
Outdoor unit VRV Cold one - dimensional A – Model: RXQ16BYM is the solution central air conditioning Luxury brands from Japan cooling capacity up to 154,000 Btu/h (equivalent to 45kW)products suitable for large commercial works such as office buildings, hotels, trade centers, etc
Technical specifications Highlights RXQ16BYM
-
Model: RXQ16BYM
-
System type: VRV A – Cold one - dimensionality
-
Refrigerant: Gas R410a – Environment - friendly, high - performance
-
Cooling capacity: 154,000 Btu/h (~ 45kW)
-
Power input: 12.6kW
-
Dimensions (Size x Width x Depth): 1,660 x 1,240 x 765 mm
-
Weight: 270 kg
The Superiority RXQ16BYM
-
Power saving It's a cutting-edge inverter technology that reduces operating costs.
-
Stable operation In all weather conditions, ensure effective cooling of large spaces.
-
Easy installation and maintenanceIt's a neat design, and it's designed to optimize the space.
-
Environment-friendly Gas - powered R410aIt doesn't perforate the ozone layer.
Practical Application RXQ16BYM
Outdoor unit VRV A model RXQ16BYM is suitable for:
-
Company offices, administrative offices
-
Restaurants
-
Trade center, showroom
-
Hospitals, schools
Why Model RXQ16BYM?
✅ Powerful refrigeration performance
✅ Smooth operation, high durability
✅ Outstanding power savings
✅ reputable, brand-affiliated, and with a good warranty
Contact Immediately to get the best quotes and solutions advice central air conditioning VRV that meet your needs!
GUIDELINES FOR INSTALLATION outdoor unit VRV A – MODEL RXQ16BYM
1. Preinstallation preparation RXQ16BYM
a/Necessary tools and equipment :
-
Drill, welder, bulge catch
-
Pressure gauge, thermometer, pliers amperometer
-
Vacuum gauge
-
Specialized vacuum cleaner
-
Gas R410a for additional testing if needed
b. Installation site inspection:
-
Right Background flat, solid, no tilt, upper load capacity 300kg
-
Somewhere well ventilated, away from direct sunlight and strong rain
-
Minimum maintenance distance:
-
Front: ≥ 1,000mm
-
Follow machine: ≥ 300mm
-
Side by side: ≥ 300mm
-
Above: ≥ 1,000mm
-
2. 📐 Mechanical installation RXQ16BYM
a. Size outdoor unit:
1,660 x 1,240 x 765 mm, weight 270kg
b. Positioning and immobilization of the footing:
-
Used bulge M10 or M12 to attach the tripod to the concrete platform
-
Minimum height mount required 150mm against the background to prevent flooding
c. Vibration reduction must be ensured:
-
Usage anti-shock rubber or a vibration isolation mat under machine legs
3. 🔌 Electrical installations RXQ16BYM
a/Sources :
-
Electromagnetic 3 phase 380 V – 50 Hz, separately granted to each outdoor unit
-
- Electric wires must meet the prescribed standards heat and load resistant on 20 A
b/Connection: -
-
Phase - ordered L1-L2-L3 and grounding according to the diagram included with the machine
-
Check fan rotation after first power supply (if reverse, reverse 2 phase wire)
c/Safety note:
-
Always disconnect the power before operation
-
CB and lightning protection according to industrial electricity standards
4. Installation of gas pipes RXQ16BYM
a/Gas pipes :
-
Use copper pipe standard thick type for R410a, fully insulated
-
Make sure the pipe is free of creases, bumps, leaks
-
The maximum pipe spacing recommended by the manufacturer (e.g. 165 m length, 50 m height difference)
b. Vacuum smoking:
-
Vacuum the entire system at least 30 minutes until pass under -756mm Hg
-
Test the seal with a pressure gauge and test the leak with soapy water
c. Additional gas filling (if necessary) :
-
Calculate how much gas to fill according to the actual pipe length (e.g., add x g gas/1 m pipe in excess of standard)
d. Condensate pipe: -------
-
Ensure slope ≥ 1%
-
Add water traps and filters to avoid clogging
5. Initiation and test run RXQ16BYM
-
Last Check All electrical, gas, drainage connections
-
Power supply, start system via central control
-
Track:
-
Suction and exhaust gas pressure
-
Temperature outdoor unit, noise, vibration
-
The current of compressor
-
-
Record operation parameters So, compare it to the standard specifications of the company
6. 🛠 Post-installation maintenance RXQ16BYM
-
Clean the grating periodically every 3 month
-
Gas and operational pressure check every 6 month
-
Maintain the entire system at least 1 times per year