Outdoor unit VRV Cold one - dimensional A, gas R410a – Model RXQ10BYM | Powerful, power - saving capacity

Introduction outdoor unit VRV A RXQ10BYM
outdoor unit VRV Cold one - dimensional A, model RXQ10BYM It's a high-end product of the system central air conditioning DaikinIt is notable for its powerful refrigeration, durable operation, and optimal power efficiency cooling capacity up to 95,500 Btu/h (~28.0 kW)This equipment is ideal for commercial buildings, office buildings, hotels, or large-scale commercial centers.
Key technical specifications
| Specification | Value |
|---|---|
| Model | RXQ10BYM |
| Type of gas used | R410a – Eco-friendly |
| Mode | Cold One |
| Cooling capacity | 95,500 Btu/h (~28.0 kW) |
| Power input | 6.41 kW |
| Dimensions (Size x Width x Depth) | 1,660 x 930 x 765 mm |
| Weight | 210 kg |
The outstanding advantages of outdoor unit RXQ10BYM
-
✅ Energy efficiency: outdoor unit uses modern inverter technology, which effectively reduces power consumption.
-
✅ Quiet and stable operation: With optimal design and high quality materials, the product minimizes noise during operation.
-
✅ Compact design, easy to install: Proper dimensions provide flexibility in the layout of the installation space.
-
✅ Use of environmentally friendly R410a gas: Cold gas does not harm the ozone layer, meeting modern environmental standards.
Practical Application
outdoor unit Daikin VRV RXQ10BYM suitable for many medium and large - scale works such as:
-
Offices, high-rise buildings
-
Hotels, resorts, shopping malls
-
Hospitals, schools and factories
Why choose outdoor unit VRV A RXQ10BYM?
-
High reliability from the brand Daikin
-
The System central air conditioning is smart, scalable
-
🔹 Technical support and long-term maintenance
Get in touch with me right away for the best quote
If you're looking for a Efficient, economical and sustainable cooling solutions, don't ignore outdoor unit VRV A RXQ10BYMPlease contact us to receive best quote, technical assistance and consulting for appropriate system design.
🔧 1. Preparation for installation
✅ Tools and equipment required:
-
Pressure gauge, line clamp
-
Vacuum pump, copper pipe welder
-
Clasping device, force wrench, wrench
-
Standard copper pipe (L - type minimum)
-
Standard electrical wires (power cable, control cable)
-
Support or tripod (if installed on a roof)
✅ Check the proper placement:
-
Durable, least-bearing flat 300kg (heavy load 210kg)
-
Airway clearance distance:
-
Minimal 300mm side
-
Minimal 1,000mm front
-
Avoid direct sunlight and strong winds
-
🧱 2. Fixed outdoor unit
✅ Fixed installation:
-
Place the outdoor unit on a footstool or rubber - lined concrete base.
-
Secure it firmly with an expansion bolt or a specialized screw.
-
Host guarantees absolute level to avoid vibrations and block failures.
🌀 3. Copper Tube Connection
✅ Copper pipe requirements:
-
The correct size specified by Daikin (see model technical guidelines RXQ10BYM)
-
Seal with nitrogen gas to avoid oxidizing the tube
-
Insulating all gas pipes (liquid and steam pipes)
✅ Length of pipe and height:
-
Total pipe length maximum: approximately 165 m (according to technical catalogue)
-
Maximum height difference: 50m
-
Oil separators should be installed if height exceeds 40 m
⚡ 4. Electrical Connection
✅ Sources: ------- -
-
Electromagnetic 3 phase 380 V – 50 Hz
-
Power line sufficiently loaded (minimum ) 4-6 mm), with grounding wire
-
Breakpoint or CB separately for each outdoor unit
✅ Connect to the correct diagram:
-
Compliance manufacturer's electrical diagram
-
Use dedicated, jam-resistant control cables
💨 5. Vacuum & gas pump
✅ Vacuum the entire system:
-
Connect the clock and pump the vacuum to the service valve
-
Vacuum at least 30 minutes or until pressure < -760mm Hg
-
Make sure no leaks are found with a soapy spray or gas detector
✅ Filling gas R410a (if necessary):
-
Calculating the amount of gas by the actual pipe length
-
Get the right gas R410a, load in liquid, do not load vapor
-
Gas balance on an electronic scale
* 6. Test and verify
-
Power CB on, voltage stability check
-
Boot System From Central Control
-
Check for current, gas pressure, noise, vibration
-
Make sure no bugs are reported and the machine is stable
📋 7. Handover and instructions
-
Technical instructions for customers: basic use and maintenance
-
Specify installation specifications: pipe length, gas load, electrical specifications
-
Send warranty cards, installation diaries and technical documents
Important Notes
-
The installation must be technical unit certified by Daikin or authorized
-
Installation errors can cause warranty loss, performance degradation or device crash
Do you want me to design professional installation guide PDF or diagram illustrating pipes, power and installation positions No?