Key technical specifications RWEYQ16TYM

  • Cooling capacity: 44.8 kW
  • Heating capacity: 50.0 kW
  • Index COP: 5.8 W/W (optimal energy efficiency)
  • Power supply: 3 pha / 380V / 50Hz
  • Power input (cooling): 7.72 kW
  • Power input (Super): 7.96 kW

Original page prices at the date of copying 10/11/2026. Contact to confirm the current quotes.

PRODUCT DETAILS

Description & technical specifications

Outdoor unit VRV Daikin water-cooled RWEYQ16TYM – Superior Performance

Outdoor unit VRV Daikin water-cooled RWEYQ16TYM

Outdoor unit VRV Daikin water-cooled RWEYQ16TYM The best solution to the problem is the system air conditioning With high efficiency, energy saving and optimal design, the product meets all cooling and heating needs of modern buildings.


Key technical specifications

  • Cooling capacity: 44.8 kW
  • Heating capacity: 50.0 kW
  • Index COP: 5.8 W/W (optimal energy efficiency)
  • Power supply: 3 pha / 380V / 50Hz
  • Power input (cooling): 7.72 kW
  • Power input (Super): 7.96 kW

Design for Flexible Connect

  • Connection pipe Waterways: (1/4B – 1/4B – 1/2B) x 2 (Ren trong)
  • Pipes refrigerant: D15.9/D28.6
  • Machine size (C × R × D): (1000 x 780 x 550) x 2 mm
  • Weight (operating): 146 x 2 (148 x 2) kg

High Performance & Quiet Operations

  • Noise: 53 dB(A) – Quiet operation, no environmental impact.
  • Refrigerant R410a: It's eco-friendly, user-friendly.
  • Power control: 23 -100%, which optimizes workability according to actual needs.

Advantages

  1. Energy efficiency: High COP, which reduces operating costs.
  2. Compact design: Easy to install in confined spaces.
  3. Superior durability: Use high-quality materials that will ensure a long life.
  4. Flexible control: Response quickly to changes in heat load requirements.

Practical Application of outdoor unit VRV Daikin RWEYQ16TYM

Outdoor unit VRV Daikin RWEYQ16TYM is the perfect choice for works that require modern, efficient, and energy-efficient air conditioning systems. Here are the common applications:


1 The Trade Center

  • Meet the cooling and warming demands of large spaces with constant traffic.
  • It operates smoothly, without affecting the customer's shopping experience.
  • Energy savings, which reduces operating costs for large shopping malls.

2 The Office Building

  • Provide a steady temperature, creating a comfortable working environment for your employees.
  • Flexible control systems for each area, optimizing energy efficiency.
  • Compact design, easy to install in limited technical space.

3. Hotel

  • Provide optimal comfort to guests by providing precise temperature control.
  • Be gentle, not disturb the peace of the rest space.
  • Easy to maintain, long life and stable operation.

4 Manufacturing Plant

  • Make sure the temperature is right for the production and storage of the product.
  • High durability, stable operation in harsh industrial environment.
  • Save energy costs, reduce financial load for the business.

5 Luxury Apartments

  • Provide comfortable living spaces with adjustable temperatures.
  • The VRV system saves installation space and ensures overall aesthetics.
  • Safety and environmental friendliness by use of refrigerant R410a.

6. Public Works

  • Suitable for hospitals, schools, theatres and large public spaces.
  • The power control system is flexible, easily meeting the constantly changing use needs.

With all of these different applications, outdoor unit VRV Daikin RWEYQ16TYM Not only does it meet the needs of cooling and heating, but it also saves on operating costs, increases energy efficiency, and ensures the most comfortable experience for the user.

Installation Guide outdoor unit VRV Daikin RWEYQ16TYM Detail

The installation of outdoor unit VRV Daikin RWEYQ16TYM requires precision and adherence to technical standards to ensure optimal operational performance. Here are detailed guiding steps:


1. Preinstallation preparation

  • Check the installation site:
    • Choose a well-ventilated, accessible location for maintenance.
    • Make sure there is no obstruction to the airflow from outdoor unit.
    • Avoid areas near heat sources or high humidity.
  • Ground test:
    • The ground must be flat, hard and strong enough to withstand the weight 148 x 2 kg of the machine.
    • Use a concrete support or platform if necessary to ensure stability.
  • Required equipment:
    • Drill, wrench, screwdriver, measuring tape, pipe welder, and other pressure and temperature measuring equipment.
    • The refrigerant duct, the water pipe, the power cable are consistent with technical specifications of outdoor unit.

2 Installation outdoor unit

  • Set the machine to the right position:
    • Set the machine to the right orientation, making sure it is not tilted or misaligned.
    • Keep the minimum distance 300 mm from the back and sides of the machine to the wall to ensure good air flow.
  • Mount the bracket:
    • Secure the machine with sturdy nuts to avoid shaking during operation.
    • Check the balance of your machine with a ruler.

3 Pipeline connection

  • Water pipes:
    • Connect the pipes in, out, and out at the respective ports ((1/4 B – 1/4 B – 1/2 B) x 2 inner lace).
    • Use a gasket and tighten it to prevent leaks.
  • Pipes refrigerant:
    • Connect the copper tubing to size D15.9/D28.6 in the correct direction (liquid – tight).
    • Seal any connections to ensure that no air leaks.
  • Tightness test:
    • Use nitrogen gas to check the pressure of the pipe and make sure there is no leak.

4. Wire Connection

  • Power supply:
    • The power supply 3 phase 380 V/50 Hz is connected according to the manufacturer's electrical scheme.
    • Use a wire with a cross section that matches the power of your machine (7.72 kW for the cold side, 7.96 kW for the warm side).
  • Control wire connectors:
    • Connect the signal wire from outdoor unit to indoor unit as directed.
    • Check the connectors to make sure they are solid.

5. Charge refrigerant (gas)

  • Check the amount of refrigerant preloaded:
    • Each outdoor unit has been preloaded 3.5 kg R410a. If the system uses more, the correct amount of the design should be loaded.
  • Perform vacuum extraction:
    • Vacuum the system to remove air and steam from the pipes.
  • Additional gas intake:
    • Add more gas if necessary, making sure the pressure and amount of gas are correct.

6 Testing and Test - Running

  • Check the entire system:
    • Make sure the electrical connections, water pipes, and refrigerant do not leak.
    • Measure pressure, current and temperature to be sure it is in technical specifications.
  • Test run:
    • Start your car and check both the cooling and heating settings.
    • Monitor noise (53 dB(A)) and cooling/slow performance.

7 Handover and Use Guidelines

  • Instructions to customers:
    • Explain basic operation and maintenance.
    • Make sure to maintain your machine on a regular basis to ensure its longevity and performance.
  • Handover of documents:
    • Provides documentation and technical specifications details.

Important Considerations

  • Always follow the safety regulations when installing.
  • Use authentic parts and accessories to ensure the quality.
  • Contact a professional if you have any problems with the installation process.

Proper installation will help outdoor unit VRV Daikin RWEYQ16TYM to operate efficiently, sustainably and energy-efficiently.