Air Wind Connecting Cold Machine GREE 2-way heating/cooling FGR25/C-M – Solution air conditioning Large Capacity

Air-pipe-connected GREE 2-way heating/cooling FGR25/C-M air-conditioners are ideal for large spaces, ensuring efficient cooling and heating with a powerful power. Subtle ceiling hiding designs save space and provide optimal comfort.
🔥 Technical specifications Rise FGR25/C-M
✅ Powerful, efficient operation
- Cooling capacity: 24.5KW ~ 84,000BTU/H
- Heating capacity warm: 27.5KW ~ 94,000BTU/H
- Power supply: 3Pha/380V/50Hz
- Power input electricity:
- Cooling: 10.2KW
- Heating: 9KW
- The amount refrigerant R22: 7kg
✅ Indoor unit (Indoor Unit) – Impressive performance
- Voltage: 3Pha/380V/50Hz
- Airflow: 4.800m³/h
- Power output: 1.5KW
- Currents: 3.4A
- Static pressure: 110Pa
- Sound pressure level: 54 dB – Quiet operation
- Machine size (HxWxD): 500x1500x1000 mm
- Weight: 150Kg (statement) / 200Kg (sum)
- Suspend the drain: 25.4mm
✅ Outdoor unit (Outdoor Unit) – High durability, stable operation
- Voltage: 3Pha/380V/50Hz
- Fan speed: 850 rpm
- Currents: 15.27A
- Sound pressure level: 66 dB
- Copper pipe size: Φ 16/28 mm
- Machine size (HxWxD): 1600x1150x360 mm
- Weight: 185Kg (statement) / 200Kg (sum)
🔥 Why Opt for Air-Tube Erection GREE 2-way heating/cooling FGR25/C-M?
✔ Large capacity, suitable for large space such as restaurants, conference rooms, large offices.
✔ The design of the ceiling helps maximize space and aesthetic.
✔ Quiet, durable, and power-efficient.
✔ The ability to cool and heat quickly, in all weather conditions.
📞 Contact your local Planned Parenthood office for the best possible advice and quotes!
Practical Application of Wind Pipes-Alder GREE 2-way heating/cooling FGR25/C-M

A high-power and flexible ceiling-hiding design air-tapered air-conditioner GREE 2-way heating/cooling FGR25/C-M is presented. It is widely applicable in a variety of spaces where air conditioning is needed, and is robust, stable, and aesthetically pleasing.
1 Shopping malls, supermarkets
- Provide a steady flow of cold air, maintaining a steady temperature over large areas.
- Meet the need for quick cooling or warming, which gives customers a good comfort while shopping.
2 Restaurants, hotels, auditoriums
- The concealed ceiling design gives a fashionable, modern space.
- Quiet operation, no impact on customer experience.
- The powerful power helps to cool/warm up quickly even in crowded environments.
3 Office, high-rise building
- A wind tunnel attachment system helps distribute cold air evenly throughout the workspace.
- Low noise levels, which do not affect concentration or performance.
- Conserve electricity, optimize your operating costs.
4 Hospitals, clinics
- Keep the temperature stable, and make sure the environment is clean and comfortable for the patient.
- A wind tunnel system helps distribute air evenly, avoiding localized cold.
5 Buildings, refrigerated warehouses
- High power helps to cool/warm quickly in large spaces.
- Sustainable operation, adapted to industrial environment.
💡 With efficient cooling and heating, GREE FGR25/C-M is the ideal air conditioning solution for large spaces, which optimizes the experience and saves operational costs.
📞 Contact them immediately for detailed advice!
Installation and Operation Guide for the Air-Tube Coupler GREE 2-way heating/cooling FGR25/C-M
Air-pipe-connected air-conditioners GREE 2-way heating/cooling FGR25/C-M are high-capacity air conditioning devices and require proper installation techniques to ensure performance and durability. Here we provide detailed instructions from installation to operation.
1. Installation instructions GREE 2-way heating/cooling FGR25/C-M
1.1. Preinstallation preparation
🔹 Examine all parts of the machine, including outdoor unit, indoor unit, copper pipes, electrical wires, drains, and accessories.
🔹 Determining the proper installation location:
- Indoor unit (Indoor Unit): Install it on the ceiling, making sure to keep a safe distance from walls and other obstacles.
- Outdoor unit (Outdoor Unit): Place it in a well-ventilated area, away from direct sunlight and drafts.
1.2 Installation indoor unit
✅ Step 1: Secure a bracket or bracket in the ceiling, making sure it is sturdy.
✅ Step 2: Position indoor unit on the mount, check balance with the measuring tape.
✅ Step 3: Connect the copper pipe to indoor unit (note pipe size Φ 16/28 mm).
✅ Step 4: Reconnect the condenser (25.4mm) drain and check the slope to ensure that the water does n't stagnate.
✅ Step 5: Connect the wires according to the manufacturer's diagram, ensuring the correct phase (3 Pha/380 V/50 Hz).
1.3 Installation outdoor unit
✅ Step 1: Set outdoor unit on a sturdy support, at least away from the wall 50/ inch ( cm) to ensure good air circulation.
✅ Step 2: Connect the copper pipes from indoor unit to outdoor unit, check for gas leaks with a vacuum cleaner.
✅ Step 3: Connect the power supply and control signal wires between outdoor unit and indoor unit.
✅ Step 4: Check the gas pressure before you start.
2. Machine Operation Guide GREE 2-way heating/cooling FGR25/C-M
2.1. Pre-Start Testing
🔹 Inspect all copper pipes, electrical wires and drainage pipes to ensure no leakage.
🔹 Ensure a stable power supply (3 Pha/380 V/50 Hz) before powering the machine.
🔹 Check the controller and set your desired temperature.
2.2. Start Machine
✅ Step 1: Press the Power button on your remote or central controller.
✅ Step 2: Select the operating mode:
- Cooling Mode when cooling down.
- Heating (Heating Mode) When you need to raise the temperature.
✅ Step 3: Adjust the fan speed appropriately to ensure that the air is evenly vented throughout the room.
✅ Step 4: Check the noise, vibration, and output temperature to make sure your computer is running properly.
3. Regular Maintenance and Sanitation GREE 2-way heating/cooling FGR25/C-M
🔹 Air filter cleaning: 1 -2 every month to avoid dust that can reduce cooling performance.
🔹 Check for cold gas: Every 6 month to ensure sufficient gas R22 for the machine to work.
🔹 Sanitizing outdoor unit and indoor unit: 3 -6 months to extend the life of your machine.
🔹 Testing of drainage systems: Make sure there are no clogs, or leaks.
Important Considerations When installing and Using
✔ Only allow the skilled worker to install the equipment to ensure safety.
✔ Do not disassemble or repair the machine if it is not working properly.
✔ Ensure stable power supply to avoid equipment failure.
✔ Do not place obstacles blocking the air flow to optimize cooling/warming.
💡 With the detailed instructions above, you can ensure that your GREE 2-way heating/cooling FGR25/C-M air conditioner is stable, durable, and at full efficiency! 🚀




